• Home
  • About us
  • News
  • Team
  • Projects
  • Career
  • Contact
  • PT
  • EN
  • ES
  • DE

Grid Connection in Moura

22.06.2021

In June 2021, a photovoltaic plant with an installed power of 49 MWp was put into operation in Moura.

Back
  1. WiNRG Iberia
  2. News

© 2025 WiNRG Iberia

  • Contact
  • Privacy Policy
  • Imprint